Breezometer Sonde  
 | 1 |  2 |  3 |  4 |  5 |  6 |  7 |  8 |  9 |  10 |  11 |  12 |  13 |  home  SGM-Iceberg-Probe
drilling hole setting up
Field test 2 | Aarau, Switzerland, May 2005

ice_detector

Field test 2 | Aarau, Switzerland, May 2005

The “mobile borehole” was installed inside a manhole in the pedestrian zone of Aarau. A wooden platform with hole was built atop the manhole and atop the platform the yellow tent was set up against the rain.

fig. up: A cross section of the exploratory station with vertigo-technology [mobile borehole] hidden inside the manhole for a probe dive up to 120m into the depths.

 

drilling hole setting up

drilling hole setting up

Probe operators in Aarau

eis_detektor

The setting up | Drill site installation

drilling hole setting up

 

ffUR || "Forschungsfloss für Unterirdische Riffologie info@ffur.de